Pricing
What shapes a scope of work
We do not publish rates. Scope cannot be priced before it is known, and a figure printed here would be one we invented to look reassuring. What follows is the framework we price against, so you can see your own engagement before you ask about it.
The reason for the position is structural rather than coy. A back office is priced against a scope of work, and a scope of work is a description of which functions get run, at what volume, in which systems, over which hours. Two roofing companies of the same size can sit a long way apart on every one of those, so a single published figure would have to be either the most expensive plausible engagement or the cheapest, and both are misleading in different directions.
What we can do is show you the dimensions, so the conversation starts with you already knowing roughly where you sit on each. Nothing below has a range attached, deliberately — a range is a number wearing a hedge, and it would anchor you to a figure we have not earned the right to give.
Five things that move the answer
-
Which functions
A single desk The whole back office
The largest single factor, and the most obvious. One well-defined function is a different engagement from nine interlocking ones, and the difference is not simply additive — some functions get cheaper to run together because they share a record, and some get harder because they need reconciling against each other.
-
Transaction volume
Steady and predictable High and spiky
Not company size. A smaller company running heavy claim volume can carry more back-office load than a larger one doing straightforward retail work. What matters is how many things happen that need recording, chasing or answering, and how evenly they arrive.
-
Platform complexity
One system, well kept Several, and disagreeing
Working inside a single well-maintained system is straightforward. Working across several that hold overlapping records, none of which quite agree, means part of every task is reconciliation before the task itself begins. Migration or cleanup, where it is needed, is scoped separately rather than absorbed silently.
-
Coverage hours
Business hours Extended and after-hours
A desk covering the hours your office already keeps is a different commitment from one covering evenings, weekends or a storm surge. Coverage is defined in the scope of work rather than assumed, because an expectation of availability that was never written down is the most common source of disappointment in this arrangement.
-
Seasonality
Level through the year Sharply seasonal
Roofing rarely runs flat. An engagement built for your quiet months will fail in your busy ones, and one built for peak is being paid for through the trough. How the scope flexes — and what triggers the flex — is agreed up front rather than negotiated in the middle of a surge.
Tell us your shape
Answer against the five dimensions above in whatever detail you have. You will get a written proposal naming the functions we would take, what happens inside each, what stays with you, and what it costs. If we think the scope you have described is wrong, we will say so before quoting it.
Questions about cost
Why is there no price list?
Because a price list would require us to know your scope before you have told us what it is, and the honest version of that is a number invented to look reassuring. The functions, the volume, the systems and the hours all move the answer independently. Publishing a figure would mean either quoting the most expensive plausible engagement, which is misleading, or the cheapest, which is worse.
Is this hourly?
The engagement is defined by a scope of work rather than by time. What you agree to is a set of functions, what happens inside each one, and what the reporting looks like — and what you are told is what running that scope costs. That is deliberate: paying for time makes efficiency your problem to police, and paying for a function makes it ours.
What is the smallest engagement you would take?
A single function, genuinely. Some of the most useful engagements start with one desk that is visibly costing the owner attention, and stay there. We would rather run one function well than take a broad scope neither side has thought through, and a first proposal that covers less than you asked about is usually us saying we can see where the real problem is.
How long until we get a number?
After the discovery call, in a written proposal that names the scope the number attaches to. We do not quote in the call itself. A figure given before the scope is written down is a figure that will be revised, and revising it later reads as a bait even when it is not.
Can the scope change once we start?
Yes, in writing, and it usually does. The first month of running a function is when its real shape becomes visible, and a scope that never changes afterwards is normally one nobody is looking at closely. What does not happen is a change that appears on an invoice before it appeared in a document you agreed.
What if we only need help during storm season?
That is a scoped engagement rather than a refusal. Seasonal shapes need more definition than continuous ones, not less — what triggers the ramp, what the desk covers while it is running, what happens to the records between seasons, and how it stands back up. Those questions get settled before the first busy week, not during it.
Related
- How working with us works The three steps, what we need from you, and how a handover is reversed.
- Comparing the two models Which shape fits a company of your size, including when ours does not.
- All nine departments What each function covers, which is the first dimension above made concrete.
Scope first, then a number attached to it
The proposal names what we would take and what stays with you. If the scope is wrong you will find out reading it, not paying for it.